Install & de-install.

Rigging, site-prep, cryogen and magnet work, room reconstruction, DICOM/PACS integration. A single project manager from first walk-through to first patient scan.

Avg. magnet install 4 weeks
01 / Services

What we handle.

Full-service or any piece of it. Most clients take the whole package; a few prefer to run the GC themselves.

Installation

New-site, replacement, or relocation. We handle the magnet, the console, and everything in between.

  • Rigging and crane coordination
  • RF shielded room construction
  • Cryogen delivery, fill and ramp
  • Power, HVAC, chilled-water tie-ins
  • DICOM / PACS / EMR integration

De-installation

Responsible decommissioning, removal and disposal — with options to trade-in against your next system.

  • Cryogen ramp-down and recovery
  • Magnet crate, rig and transport
  • Room restoration to specification
  • Hazmat and lead-shielding disposal
  • Consigned resale option
  • Trade-in credit against next buy
02 / Process

The MRI timeline.

Click a step to see the detail. Timelines shown are typical MRI installs — CT and other modalities are faster.

01
Site survey
Week 1
02
Drawings & layout design
Weeks 1–2
03
Rigging & delivery
Week 3
04
Cryogen & ramp
Week 3–4
05
Calibration & QA
Week 4
Step 01 · Week 1

Site survey.

We walk the space with your facilities team — ceiling height, door widths, shielding, power, chiller loop, vent path. You leave the meeting with a go/no-go.

Structural load path verified
Cryogen vent route mapped
Electrical service and chilled water confirmed
Crane / rigging path identified
03 / Field notes

A de-install, start to finish.

From a recent CT removal — our crew, our rigging, our packing. This is what careful looks like.

04 / Case study

GE Discovery PET/CT — out clean.

A full PET/CT suite removed from an outpatient imaging center by one engineer and two movers. Gantry, detector ring, patient table, power and support cabinets, console — everything out of the building with zero floor damage, and just one wall removed to get the machine out. Precise planning, precise execution, clean results.

1Engineer on siteLed the de-install end to end — teardown, rigging, load-out.
3Crew totalOne engineer, two movers. No subcontracted rigging crew.
0Floor damageProtection laid along the whole route, hallways to curb.
1Wall removedThe only construction needed to get the gantry out of the building.
PET detector ring crated on a skid next to the shrink-wrapped PET/CT gantry staged outside the building
Detector ring crated · gantry wrapped · staged for pickupGE Discovery PET/CT · full-suite removal

Site walk-through next week?

We work in all 50 states. Contact us with your vision and we'll turn it into a working imaging suite.